Overview
Converts a target percent slope or total drop into a finished-grade drop and triangular-wedge fill volume.
Assumptions
- Fill is modeled as a wedge from zero to the target drop.
- The entered width is perpendicular to the run.
Worked example
A 25-ft run at 2% drops 25 × .02 × 12 = 6 in. Over 10 ft width, wedge fill is 25 × 10 × (0.5 ÷ 2) ÷ 27 = 2.31 cu yd.
Common mistakes
- Using full depth rather than average half-depth for wedge volume.
- Adding fill against siding without preserving required clearances.
Limitations
Existing grade, compaction, soil settlement, and drainage routes are not surveyed.
Safety and local requirements
Contact utilities before excavation; local grading and drainage requirements govern site changes.