Labor Hour Estimator
undefined
Overview
Applies the selected project’s baseline productivity with difficulty, access, demolition, and haul-off adjustments to produce a labor-hour range.
Assumptions
- Project size uses square feet except drain trenches, which use linear feet.
- The productivity factors are planning assumptions, not measured production rates.
Worked example
If a project’s adjusted typical estimate is 24 labor hours with a 3-person crew, calendar time is 24 ÷ (8 × 3) = 1 day.
Common mistakes
- Confusing labor hours with elapsed crew hours.
- Ignoring mobilization, inspections, weather, or curing time.
Limitations
It cannot schedule a crew, price labor, or assess site-specific hazards.
Safety and local requirements
Plan safe work methods, equipment training, and utility locating; permits and inspections may affect the schedule.
Sources